Language :|   Login
    
 
 
Belka Gas Turbine Manufacturing PlantBelka

Managing Contract (MC) For Construction of a Factory and Production Line for Gas Turbine Manufacturing

 

Subject Managing Contract for design procurement of machinery and other equipment as well as construction of a factory for manufacturing of     siemens(GT-10-B) core engine Gas Turbine at shams abad industrial zone, south of Tehran.

Client: Oil Turbo compressor Company (OTC)
EPC Contractor : Oil Turbo compressor Engineering Company (OTEC)
Product : SGT600 Gas Turbine  (Range 17 -45 MW)
Production Capacity: 36 set Per Annum in two shift
Date of Contract award: May -14 th 2007

Contract Duration:   48 Months
Contract Situation:
   Undergoing

 

Belka SimpleGalleryBelka
Search Tags 
  
Belka GalleryBelka
  
Belka Gas Turbine Manufacturing PlantBelka
 
Belka SGT600 Gas TurbineBelka

 
Home  |  Projects  |  About Us  |  Contact Us
 Copyright © 2010 OTEC Company. All rights reserved.
Web Desgin and SEO  by WEBKARAN